Slideshow

MARBELLA GAZETTE

Friday, 16 March 2012

Cadíz second bridge delayed until at least 2013


The Ministry for Development has announced a delay in the opening of the second road bridge into Cádiz which will now not be open to traffic until 2013. Minister, Ana Pastor, said that not with all the money in the world could a 2012 opening be achieved. 2012 was the target date so that it coincided with the bicentenary of the 1812 Spanish Constitution which was signed in the city on March 19 1812. The General Courts of Spain were transferred there while in refuge from the Peninsular War. The Minister added, ‘It will take at least another 15 months, and that only if there is no wind’. The Ministry of Development says the suspension bridge is now 75% complete, but a fundamental part of the project, linking to the 13 pivot bases which are already showing in the middle of the Cádiz Bay is still to be done. The bridge is the largest road infrastructure project in Spain and has a cost of about 300 million € and will link Cádiz with Puerto Real. It will be known as the Puente de la Constitución de 1812, and not the ‘Puente de la Pepa’ which was the name given by the previous Minister, Magdalena Álvarez.

0 comments:

Post a Comment

Marbella Golden Mile
Twitter Delicious Facebook Digg Stumbleupon Favorites More